You attach the bottom of the first row of siding to the top of this starter strip.
Leveling siding starter strip.
A line level isn t accurate enough.
Family handyman use the wider starter strip the bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Georgia pacific 3 5 in x 10 ft galvanized steel galvanized steel vinyl siding starter strip.
Below the top of the foundation but the lower the vinyl siding is installed the better.
This is where the new siding will begin.
If it is only 1 to 2 inches out of level this should not matter because most starter strip is 3 1 2.
A water level is simply a clear plastic hose or regular hose with clear ends with water in it.
Pull a measurement down from the soffit.
Then find your lowest point of the home.
You will still be able to attach it to the wall sheathing.
Vinyl siding starter strips.
It s designed to work with most sidings.
This way you will always end level with your soffit.
Starter strip is used at the bottom of each side of the home to lock the first course of siding in place.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Required accessory for starting a vinyl siding job constructed of low maintenance durable vinyl.
What is the best way to determine a level line on the exterior of your house over 20 to 50 feet.
A hand level won t cut it and how do you level a chalk line.
Remember to make sure the sheathing is smooth before you apply the siding so the siding can be smooth also.
Cellwood vinyl starter strip is a required accessory to start any vinyl siding installation job.
For the remaining vinyl siding panels to be installed correct and level beginning with the lowest row you must install the starter strip correctly.
It protects the sheathing from rain snow and pests.
To establish a level line around a building you ll need a surveyor s level an accurate laser level or a water level.